One shared record for every work, kept current by the people closest to it.
An engineer records the work at the site, an officer checks it, and everyone else, from the district to the Assembly reply, reads from the same approved record.
Four steps, three people
Today, and with Pragati
What the Department asked for, and where to see it
| The challenge asks for | What Pragati does | |
|---|---|---|
| Simple mobile/web data entry and validation | One screen per milestone, with a photo taken in the app. The app checks the entry before it's saved. Nobody types money figures. | See it |
| Scheme, district and co-district dashboards | A State overview by district, then down to each co-district and each work. | See it |
| Physical and financial progress together | Each work shows its milestones next to its sanction, releases and spending, and flags money running ahead of the work. | See it |
| Automated alerts and standard MIS reports | Works that go quiet trigger a question to the engineer, then go up the line. Monthly review tables come out ready to print. | See it |
| Integrate or coexist with e-Rupantor | Approved figures go into e-Rupantor through its API or its upload format. | See it |
| Answering Assembly Questions and reviews | The question goes in, a draft reply comes out, with any gaps listed and the engineers asked. | See it |
How much of the progress is proven
A work's progress is the sum of its milestones. Each milestone also gets a grade for how well it's backed up. That's how a district can read "60% reported, 41% proven".
| Grade | What's attached | Counts as proven? |
|---|---|---|
| A | Site photo + measurement-book page + JE inspection note | Yes, fully |
| B | Site photo + measurement-book page | Yes, fully |
| C | Site photo only | Half the milestone's weight |
| D | Nothing. Claimed by phone or in a spreadsheet | No. Shown as reported only |
These weights and grades are a starting point. We'd agree the real ones with the Department and the engineering agencies in the first three weeks.
A milestone coming in from a site
An Assembly Question going out
A language model is used only to read the question: which scheme, place and years. Every figure in the draft comes from approved records, never from the model.
Built on the platform we already run
Roles, hierarchies, approvals, media and notifications already run in production in Vrixaa Connect, our live platform. Pragati adds the parts specific to these works. It can be hosted on the State Data Centre or a MeitY-empanelled cloud.
Access by role
Each person sees only their own works, co-district or district. Sign-in is by OTP, with a second factor available.
Nothing is overwritten
Every claim, approval, return and edit is logged with who did it, when and on which device. A correction creates a new version.
Photos that are hard to fake
Photos can only be taken in the app, stamped with location and time, and checked for fake locations and duplicates. An officer compares the old and new.
Data stays with the Department
Hosted in India and exportable at any time. The only personal data is staff names and phone numbers (DPDP Act 2023).
What we'll settle with the Department in the first three weeks
The design rests on the challenge statement and on public information about e-Rupantor and the Division's schemes. These are the points we'll confirm with the Department's officers before building the production system.
- What fields e-Rupantor holds, and whether it accepts an API or a bulk upload.
- Who updates progress today: the implementing agency, the block, or the DDC office.
- Whether releases and bills can be read from treasury data, or only from agency registers.
- How co-districts fit into approvals and reporting.
- The usual format and turnaround for Assembly replies, and how many questions come each session.