The Assembly Question is due on Thursday. The figures are still with the districts.
Pragati keeps District and Co-district Plan works answerable. It starts from the question the Department has to answer and works back to the site, the engineer and the money, so the reply is mostly written before anyone picks up the phone.
(a) the number of works sanctioned under the District/Co-district Plan in Dhekiajuli LAC during 2024-25 and 2025-26;
(b) the present status of each work; and
(c) the reasons for delay, if any?
A week before the session, the same scramble
When a question on District and Co-district Plan works reaches the Department, the figures have to be gathered from the districts before a reply can be drafted.
A question about DCP works in one constituency reaches the Department. The reply is needed within days.
A letter goes to the District Development Commissioner asking for the status of every work: sanctioned, started, completed, money spent.
The DDC office calls block, co-district and agency staff. Engineers send figures by phone and WhatsApp. Someone types them into a spreadsheet.
The spreadsheet doesn't match e-Rupantor. Nobody is sure which is right, and there's no time to find out.
The reply goes with the spreadsheet figures. e-Rupantor stays where it was, until the next question starts the same week again.
An illustrative week, drawn from the challenge statement. We'll walk through the real process with the Division during discovery.
Three reasons the figures fall behind
District users find data entry slow, as the challenge notes. Three things around that entry matter just as much, and Pragati is designed around each.
Updating is a second job
The engineer has already measured the work in the measurement book, raised the bill and reported to their own department. Entering the same thing again in another portal is extra work on top of that.
A number without proof gets checked again
"60% complete" with nothing behind it has to be confirmed by phone before anyone will put it in a reply to the House. So every question restarts the work.
Nobody asks until it's urgent
Data is pulled in a rush before a review or a session, and goes stale in between. The people who know the answer are asked too late and too broadly.
Three ideas, one system
Paste the Assembly Question. Get a draft reply and a list of what's missing.
The officer pastes or photographs the question, in Assamese or English. Pragati works out which constituency, scheme and years it's about, collects the works, and drafts the reply in the usual (a), (b), (c) format with an annexure.
Where a work has no recent evidence, it says so and asks the engineer responsible. Every past question and reply is kept, so when the same member asks again next session, most of the answer is already there.
No evidence since 12 Oct. Asked JE Bhaskar Nath at 10:52.
Walls claimed, no photo. Asked JE Rupjyoti Das at 10:52.
Not started; no release yet. Reason needed for part (c).
No progress slider. Milestones, each with its proof.
A culvert isn't "60% done". It has a foundation, barrel walls, a top slab, wing walls. Each kind of work gets a short list of milestones, and a milestone counts when its evidence is attached: a geotagged photo taken at the site, the measurement-book page, or the JE's inspection note.
The dashboard shows two numbers for every district: what's reported, and how much of that is backed by evidence. The gap between them is where the review meeting should spend its time.
Money from the bills. One question to one engineer.
Releases and expenditure already exist as sanction orders and bills. If the Department can share treasury or release data, Pragati reads it from there and the engineer never types a rupee figure.
When a work goes quiet, Pragati doesn't send a monthly form to the district. It sends one short message to the engineer responsible, on WhatsApp or SMS, that can be answered with one tap. Districts are ranked on how fresh their evidence is, and that table goes into the monthly review.
1 Yes, will send photo 2 Not yet 3 There's a problem
Built around the Department's existing systems
- e-Rupantor stays the recordPragati writes approved figures into it, by API or in the import format it already accepts.
- Agencies keep their own registersEngineers add one photo per milestone and answer one-tap questions. No new forms to fill.
- Officers sign every replyPragati prepares drafts. An officer reads, edits and sends them through the usual channel.
- Money comes from existing recordsSanctions, releases and bills are read where the Department can share them, not typed again.
Try the working prototype
Choose a role. All three share the same records, so what one person does shows up for the others.